Prepare for an Estimate
A clear estimate starts with a defined scope and a realistic access route.
Job notes
- Write down the tub’s length, width, and type.
- Photograph all sides and attached structures.
- Measure the narrowest opening on the route.
- Note turns, steps, gravel, slopes, walls, and overhead obstacles.
- Confirm the tub is drained and utilities will be made safe.